Welding the engine sub frame/chassis leg on ZX

This is the Forum for all your Citroen Technical Questions, Problems or Advice.
C.J.
Posts: 281
Joined: 25 Feb 2005, 01:44

Welding the engine sub frame/chassis leg on ZX

Unread post by C.J. »

Just how long should this take?
Whilst I appreciate after seeing the rot now, that it involves removing the brake pipes and carpet from inside, I've been quoted between 2 and 4 hours and approx £100+! :shock:

I'm wavering on scrapping the car now tbh., as it needs a wheel bearing too. :cry:
Such a shame, as it looks so tidy too.
Colin

My cars:
1988 AX GT and still running sweet. Genuine 41 k only!!
2005 Skoda Fabia vRS 83k...and truly awesome.
Vauxhall Combo crew cab SE
Citroen Saxo 1.4 Furio.

Their cars:
Hyundai Getz.
Hyundai i20

Eriba Puck caravan now too!!
User avatar
myglaren
Forum Admin Team
Posts: 28595
Joined: 02 Mar 2008, 13:30
x 5628

Unread post by myglaren »

It may not pass the MOT if welded.

My son had to have a new (second hand) subframe in his 306 last year as the subframe was corroded and they wouldn't weld it or accept it back welded as it is a critical component.

A gang of tame mechanics bought a replacement from a scrapyard and fitted it along with brake hoses, front dampers new brake discs & pads plus assorted odds and sods for a little over £300.
the_weaver
Posts: 438
Joined: 13 May 2008, 00:01

Unread post by the_weaver »

See this thread for some discussion about this:-

http://www.frenchcarforum.co.uk/forum/v ... highlight=